TESTIMONIALS

quotation marks

The level of service, flexibility and expertise shown by APC throughout the project was excellent. I would recommend APC Civils to anyone! 

Kevan Lambe, Project Manager,
Carnell Group

quotation marks

The speed and safety of the installation process APC offer is the perfect solution for us. It ensures there is no detrimental impact on productivity and allows us to continue meeting deadlines. The response from our client for the works APC carried out has been tremendous, with regards to both how the works were carried out and the quality of the product.

Kieran Ryan, Project Manager
P.J. Hegarty & Sons (U.K) Ltd 

quotation marks

APC’s temporary barrier system is versatile and adaptable; it keeps up with our site’s changing needs. The service provided by APC placing, moving and removing these barriers has always been quick, smooth, effective and efficient. They have been able to meet our demands day or night. I can’t recommend them highly enough.

Mark, Traffic Management & Logistics Manager,
Galliford Try, A45/A46 Tollbar End project

galliford logo
quotation marks

APC are professional, proactive and flexible in their approach to work. The installation, removal and location of the concrete barriers has always been carried out in a highly competent, timely and safe manner. They have also contributed in a significant and collaborative way to the management of safety and sustainability on the A46 project

Phil Hobson, Construction Manager,
Balfour Beatty Civil Engineering

balfour beatty logo
quotation marks

Just wanted to give you a quick email to say how Paul (YOUR DRIVER) was amazing yesterday, he saw we were running a bit behind and wanted to help out and I could not fault him at all, well mannered, helpful and generally a nice person to work with…

Michael Ryan, Events Project Supervisor,
GAP Group Ltd

gap logo
quotation marks

The service was responsive, from the sales team who provided a quotation within the hour, to the installation team, who carried out the installation the next day. APC were easy to work with, provided competitive pricing and installed the barriers with minimum inconvenience to road users.

Steven Musker, Managing Director,
A1 Traffic Safety Services Ltd

a1logo
quotation marks

5* service…won’t be going anywhere else for barriers…wish we had barrier jobs everyday as [APC] made it very easy for him

Terry Thwaite
One Way Traffic Management Ltd

onewaylogo
quotation marks

APC Civils Ltd have been a great support in the latter part of the project using their wide ranging specialist plant and equipment to complete small scale earthworks operations, transportation of plant around site, grading of topsoil, crushing of concrete and general plant hire, both short and long term hire.

Balfour Beatty Civil Engineering

balfour beatty logo
quotation marks

Safety at work is our number one priority. Our workers put themselves at risk daily working on such a busy road network and we expect each worker to go home every night, safe and unharmed at the end of every shift….Ingenuity, strength and flexibility of the APC system has been the key to allowing the traffic management plan to progress as phases of construction are completed. The service provided by APC installing, moving and removing these barriers has always been quick, smooth, effective and efficient and they have been able to meet out demands day or night in order to minimise traffic disruption

Traffic Management & Logistics Manager,
A45/A46 Tollbar End Project Galliford Try

galliford logo
quotation marks

This was the first time we have used APC Civils, I was impressed by their flexible approach and safe working practices. From quotation to mobilisation, their level of service was high and they were able to work to our specified timescales and work schedule. Using APC’s barriers not only safeguarded the pedestrians and cyclists on the footpath but enabled us to meet our responsibilities to protect our own workforce too

Nigel Davies, Project Manager
Alun Griffiths (Contractors) Ltd

griffithslogo
quotation marks

The standards set by APC Civils during this project were as high as we expected. They did not disappoint…their communication, with regard to every facet of the project was of the highest order and their staff were constantly responsive and flexible in adapting to our needs.

Curtis Irish, Schemes and Major Projects Supervisor
Volker Highways

volker highways logo
quotation marks

We were so impressed with how efficiently the team at APC Civils were on this important project on our high street and sea front here in Cleethorpes. It was an evolving situation and the team responded so well with some of the changes required. Our approach at North East Lincolnshire has been totally aligned to government guidance on providing sufficient space on the highway for people to achieve social distancing, but also to enable local businesses to get back to business as usual. As businesses have been allowed to reopen in a phased manner, APC’s reactive support has allowed us to deliver additional measures at the drop of a hat

Luke Greaves: Head of Highways and Transportation
North East Lincolnshire Council

quotation marks

The project to make highway improvements for the expansion of an existing industrial estate near Whitley, Coventry involved multiple areas where sites needed protecting including utility works, bridge building areas, re-directing existing footpaths and cycles lanes along the busy A45 / A46 Stonebridge Highway.  APC were able to provide a flexible temporary barrier and fencing solution and visit the site multiple times, at our convenience, to relocate barriers quickly and easily to protect the different work areas. They offered first class service levels and their concrete barrier system provided excellent containment levels to protect pedestrians, cyclists and our site team from live traffic on the A45 / A46 highway.

Adam Stubbins, Project Manager,
Buckingham Group 

buckingham group contracting
quotation marks

Recently used APC Civils on one of our projects. Were extremely impressed with their communication and commitment to the project and there wasn’t a stone unturned to make sure the project went to plan. H&S procedures were followed to the highest order and their equipment were 1st class.

Couldn’t recommend them highly enough

Adrian Tomlinson, Operations Director
WS Transportation

ws logo

Accreditations

Need guidance on the system that meets your requirements? Require technical information?

We operate:

24/7

Footer Contact Forrm